L&S America Online   Subscribe
Advertise
Home Lighting Sound AmericaIndustry News Contacts
NewsNews
NewsNews

-Today's News

-Last 7 Days

-Theatre in Review

-Business News + Industry Support

-People News

-Product News

-Subscribe to News

-Subscribe to LSA Mag

-News Archive

-Media Kit

Ninja Israel Includes a Spectacular Lighting Rig Controlled by Compulite Vectors

Compulite Vector on Ninja Israel

Ninja Warrior is a sports entertainment competition that features hundreds of competitors attempting to complete a series of obstacle courses of increasing difficulty, trying to make it to the national finals in hopes of becoming a "Ninja Warrior." The format originated in Japan and has since been sweeping audiences off their feet in hundreds of countries around the world.

After gaining immense popularity worldwide the exciting television format has finally landed in Israel, with the Israeli version hosted by Asi Azar and Rotem Sela.

The exhausting obstacle course was built at the Haifa Port in two weeks with a team of over 80 professionals using 4.5 tons of truss. The rigging and obstacle course were built by the production riggers who arrived from the US and accompany the production worldwide.

Gil Teichman of Lighting Design Systems Company was in charge of lighting and sound. Mt. Midoriyama and the host's rig were created by Itzuv Bama.

Lighting designers Ofer Jacobi and Avi-Yona Bueno (Bambi), were the creative spirit for the unique and impressive lighting design.

Jacobi said "designing lights for obstacle courses at the Haifa Port was challenging because of the enormous location; the real challenge was finding a way to combine the lighting for the environment with the lighting for the obstacle course and the television lighting. The solution was using many moving lights and fixtures and making them work together."

After many months of work, including 3D simulation programing using WYSIWYG and the complicated installation of the large lighting set, Ninja Israel finally premiered on Israeli Television Channel 12 (Keshet).

The challenging set was programmed and controlled by Compulite's Vector Blue and Vector Ultra Violet consoles and controlled via Ethernet network.

The list of equipment included:
Two Compulite e-Port 41 converters
Two Luminex 8 Port
23 Robe Robin BMFL Blade
17 Robe Robin BMFL WashBeam
50 Robe Robin MegaPointe
28 Robe Robin Spiider
12 Robe Robin 1200 Led Wash
Eight Robe Robin MMX
16 Robe Robin Pointe
116 Eco Stage Beam 200 5R
60 Eco Stage V-715 Moving Beam LED 100 RGBW
12 LED Zoom 300
24 Eco Stage Stormi 3000 CC LED
24 Eco Stage RGBW Bar LED
24 Eco Stage Top Bar 18 RGBW
21 Eco Stage Sunstrip Active (10 - 75W Halogen)
400 Par LED and RGBW for all the truss

Conventional luminaires included:
60 LED Profile Spot 120
36 Soft LED Panel
250 Par 64 MFL

This came to a total of approximately 820 fixtures controlled by Vector Blue and 350 Conventional Fixtures controlled by Vector Ultra Violet using 21 DMX universes.

Ronen Ben-Harosh was chosen for this production, freelance lighting programmer / operator who works also for Danor Theatre & Studio Systems, Compulite's official distributor in Israel.

According to the company, Ben-Harosh is among the best Vector programmers. He utilizes his knowledge and expertise in many theatre and opera shows, dance performances, television programs, and other productions.

Moreover, Ben-Harosh supports Danor Compulite customers 24/7 and teaches courses about all Compulite line consoles including the Vector family.

Ben-Harosh stated: "When Ofer Jacobi told me that we will be doing this project together, we knew that a 3D simulation will help us choose the lighting set and show Keshet TV's managers how it would eventually look in real life."

As for the lighting consoles, Ben Harosh said: "Obviously, I chose Compulite's Vector consoles to run the whole rig. I have full confidence in these consoles as I have worked with them for years and I was certain they would get the work done easily, and so they did. I worked on large scale systems before, with a lot of fixtures and DMX universes, but this set was much more complicated due to its size (150m x 60m) and the mix of fixture types."

"Thankfully, everything ran smoothly with the Vector Consoles. I used Vector Blue for the moving lights and Vector Ultra Violet for the TV fixtures, the separation was made to avoid interference between the two consoles."

"Operator Rony Shamay was in charge of the TV lights."

The premiere was a big success, with a large studio audience and great ratings. Viewers nationwide are already awaiting the next episode.

WWWwww.compulite.com


(15 August 2018)

E-mail this story to a friendE-mail this story to a friend

LSA Goes Digital - Check It Out!

  Follow us on Twitter  Follow us on Facebook

LSA PLASA Focus