L&S America Online   Subscribe
Advertise
Home Lighting Sound AmericaIndustry News Contacts
NewsNews
NewsNews

-Today's News

-Last 7 Days

-Theatre in Review

-Business News + Industry Support

-People News

-Product News

-Subscribe to News

-Subscribe to LSA Mag

-News Archive

-Media Kit

New Team Members and the Launch of EEE Build as Triple E Expands

Darren Green and Rowan Coupe, Triple E

Triple E announces the addition of two important members of staff as well as the exciting launch of a brand-new division of the organization headquartered in Biggin Hill, UK.

The last few months have seen two significant appointments -- namely Darren Green joining the growing team of project managers, and Rowan Coupe as installations manager as he heads up the newly created "EEE Build" division of Triple E.

Both Green and Coupe join the company with a wealth of industry experience, and both have a considerable knowledge of working alongside Triple E in their previous roles.

Green has a noteworthy background in theatre product design, engineering, and project management working at notable companies including Theatre Projects, Harkness Screens, Hall Stage, and Centre Stage Engineering. Green has worked alongside the Triple E team on many projects in the past such as Fairfield Halls in Croydon. Now fully integrated into the Triple E team, Green's focus is on managing large-scale, high-value projects across the entertainment sector. Green is also working with Triple E's senior management team on the implementation of ISO 14001, ISO 45001, and ISO 9001 and enhancing operational procedures throughout the company.

Commenting on Green's appointment, managing director of Triple E, David Edelstein, "is delighted to welcome Darren to the company. He brings with him a wealth of experience and great knowledge in his field."

Another recent development for the company has been the launch of a new division EEE Build (pronounced E Build) with the appointment of Rowan Coupe to head up this important addition to the company structure.

"We have become increasingly aware that our customers are looking for a one-stop shop for many of the projects we work on. The demand is there for a complete consultancy, manufacture, and installation package of our track systems so it made perfect sense to bring installations back in-house with the launch of our brand new 'EEE Build' division," expands Edelstein.

EEE Build offers Triple E's clients a direct installation service by a fully integrated Triple E team who have an in-depth understanding of the products they are supplying and installing. The new division will support their installation work by offering servicing, maintenance, LOLER, PUWER, and PPE inspection on all manner of stage machinery and lifting equipment.

Newly appointed installations manager Coupe is an experienced rigger who forged his early career at Earls Court in West London with world-renowned Unusual Rigging, progressing to project management and most recently as supervisor on some well-loved West End and touring shows. "I am very excited about joining the Triple E family and heading up EEE Build. It is a great new challenge to be working for another well-known industry name on the development of a brand-new division," he explains.

"Rowan is highly qualified in all aspects of rigging, permanent installations, and crew management" adds Edelstein. "Our new installations manager had to be competent in installation, inspection, and maintenance. We knew Rowan had the skills that we required for this important role -- it's the perfect fit for him!"

Through this new division and the wide network of contacts Coupe brings with him, the company is uniquely placed to offer a range of bespoke installation solutions for projects outside the industry such as crematoria, shipyards and private estates, alongside key industry installations in symphony halls, film studios, cinemas, and installing new counterweight sets in theatres across the UK and in the West End.

EEE Build is already fully operational, and the new company has been extremely well received by key clients. Brought in by Babcock to provide an access solution for its advanced manufacturing area of the business, Triple E provided a full design, supply, training service, and installation by EEE Build.

Samuel Barton, project manager at Babcock, said: "The project ran smoothly from conception through to design and installation. It was great to work with Triple E, especially the EEE Build installation team whose performance on-site was exemplary. I look forward to continuing working with Triple E, both to maintain and service our current platforms, and install new ones."

For any installation, maintenance, or servicing needs from EEE Build, contact Rowan Coupe at email: rowan@triplee.ltd. Tel: 01959 570 333

To discuss future projects please contact Darren Green at email: darren@triplee.ltd. Tel: 01959 570 333

WWWwww.triplee.ltd


(7 June 2021)

E-mail this story to a friendE-mail this story to a friend

LSA Goes Digital - Check It Out!

  Follow us on Twitter  Follow us on Facebook

LSA PLASA Focus